Čelik d.o.o. Bački Jarak
  • Home
  • About us
    • History
    • Our team
    • Technical Capacities
    • Licences
    • Quality and Sertificates
    • Services
  • News
  • References
  • Contact
  • sr
  • en

Railway Station Novi Sad

Investor: Serbian railway infrastructure

Client: China Civil Engineering Construction Corporation
Location: Novi Sad
Object type: Railway station platform canopy
Start of the project: 12.2021.

zs 4
zs 5
1649676958038
1649676958035

1649676958032
zs 3
zs 2
zs 6

zs 10
zs 7
zs 8
zs 9


processed-33a684e7-93f1-4a0c-a446-4cb6c5341592_LGm3voou
processed-9c4133c3-929a-4f66-8c76-d19d6f42dcac_F5xnJPKo
processed-001f51fc-2cd6-4571-aa4c-cd90c9f928cf_wWitSOzK
processed-ad2f0dd4-e6f3-4d88-a704-862e941f0fb3_nr8HGn3t

processed-85e0ca1a-6bb0-49a7-aa2f-a28f472ddd2e_4RQzbhI0
processed-5e3e8168-2c59-43ad-8764-18680935c340_KCOe07uo

processed-ad7a4724-c0c0-4e79-ba9e-e5f240aac7ec_f2C1hf53

Stadium TSC Railway bridge over the river Begej

Related Posts

Active Project

Logistics center

Active Project

Production hall

Active Project

Shopping mall in Obrenovac

Recent Posts

  • logo_SilverAAA_sr-Latn-CSSilver credit excellence
    May 17, 2022
  • ffcb7cda-c537-4700-b036-c12e3114a695Logistics center
    April 21, 2022
  • Screenshot_3Production hall
    April 21, 2022
Čelik d.o.o. Bački Jarak

© ČELIK DOO Bački Jarak 2018