Čelik d.o.o. Bački Jarak
  • Home
  • About us
    • History
    • Our team
    • Technical Capacities
    • Licences
    • Quality and Sertificates
    • Services
  • News
  • References
  • Contact
  • sr
  • en

Tire factory

Investor: Ling Long Tire

Client:  China Energy Engineering Group Tianjin Electric Power Construction Co
Location: Zrenjanin
Object type: Production hall, 5.000. t steel truss structure
The duration of project: 10.2020.- 06.2022.

IMG_20210903_152546684
IMG_20210903_152451772
20220427_115549
20220427_115530

20220427_115716

Canopy 48×126 m Shopping mall in Obrenovac

Related Posts

Completed Project

Residential building on the island of Brač

Completed Project

Railway bridge in Niš

Active Project, Completed Project

Production hall Čelik doo

Recent Posts

  • logoSteel structure of the business and production complex – Nidec
    January 25, 2023
  • Residential building on the island of Brač
    December 19, 2022
  • download (1)Voortman steel processing line
    December 2, 2022
Čelik d.o.o. Bački Jarak

© ČELIK DOO Bački Jarak 2018