Čelik d.o.o. Bački Jarak
  • Home
  • About us
    • History
    • Our team
    • Technical Capacities
    • Licences
    • Quality and Sertificates
    • Services
  • News
  • References
  • Contact
  • sr
  • en

Procurement of equipment for the assembly of steel structures

The construction sector is conditioned by permanent modernization, that is, work with more modern, reliable and precise equipment.

For this reason, our company Čelik doo works on continuous modernization with the aim of increasing reliability, efficiency, speeding up and improving the quality of construction. This is an integral part of our mission and represents our daily imperative, and at the same time it is the biggest challenge of today’s business environment.

Considering the above, we are pleased to share the news with our clients and business associates, that in the last 30 days we have acquired 2 new machines, a MERLO telehandler and a LIEBHERR crane.

Telehender Merlo 50.26S

The Merlo Group is the leader in the telehandler market and offers a wide range of machines that incorporate the latest technologies that ensure top performance.

For this reason, when choosing equipment for assembly, our choice fell on the new Telehender Merlo 50.26S, with a load lifting capacity of 5 tons and a maximum lifting height of 25.9m.

telehender

This model is characterized by exceptional comfort, it is equipped with intelligent hydropneumatic suspensions and accessories that improve standards, all in order to fully satisfy the growing demands of customers and the market, which is the priority goal of our company Čelik doo.

dizalica

CRANE LIEBHERR LTM 1070-4.1

Liebherr crane from the world manufacturer, which sets standards in terms of quality, functionality and safety of mobile cranes. Model Ltm 1070-4.1, lifts loads up to 70t and ensures a high level of controllability during use. The load lifting height is 50m.

If you need a crane for the construction of buildings and the realization of your plans, we also provide a rental service with an operator.

Moving to a new office space! The progress of the new hall construction of Čelik doo Bački Jarak is really impressive!

Related Posts

News, Novosti

EN 1090-2 EXC 4

News

Voortman steel processing line

News

Construction of the Niš-Dimitrovgrad gas pipeline

Recent Posts

  • TUV-150x150EN 1090-2 EXC 4
    March 17, 2023
  • logoSteel structure of the business and production complex – Nidec
    January 25, 2023
  • Residential building on the island of Brač
    December 19, 2022
Čelik d.o.o. Bački Jarak

© ČELIK DOO Bački Jarak 2018