December 19 2022 Residential building on the island of Brač Investor: Natural person Location: Bol, CroatiaThe duration of the project: 09.2022.-11.2022.
October 10 2022 Railway bridge in Niš Investor: Bricken doo Location: NišObject type: Road object – bridgeThe duration of project: 10.2022. – 11.2022.
September 15 2022 Production hall Čelik doo Investor: Čelik doo Bački Jarak Location: Bački Jarak Object type: Production hall Start of the project: 03.2022.
August 24 2022 Hotel Porta Patria, Hungary Investor: Porta Barfta Kft. Location: Pecs, HungaryObject type: Roof construction and antenna poleThe duration of project: 05.2022. – 07.2022.
August 24 2022 Canopy for silos Investor: Abraziv Kft. Location: Kiskunfélegyháza, Hungary Object type: Steel canopy construction for silos The duration of project: 05.2022. – 10.2022.
April 21 2022 Production hall Investor: Termometal doo Location: AdaObject type: Production complexStart of the project: 08.2021.
April 21 2022 Shopping mall in Obrenovac Investor: Divao Properties doo Location: ObrenovacObject type: Shopping mall and retial parkStart of the project: 11.2021.
April 19 2022 Tire factory Investor: Ling Long Tire Client: China Energy Engineering Group Tianjin Electric Power Construction CoLocation: ZrenjaninObject type: Production hall, 5.000. t steel truss structureThe duration of project: 10.2020.- 06.2022.
April 18 2022 Canopy 48×126 m Investor: Promist doo Location: PančevoObject type: Canopy – steel structure and roofing worksThe duration of project: 02.2021. – 09.2021.
April 13 2022 Railway bridge over the river Begej Investor: Serbian railway infrastructure Investitor: Infrastruktura železnice Srbije Naručilac: Karin komerc md dooLokacija: ZrenjaninTip objekta: Putni objekat – mostTrajanje projekta: 12.2021.-03.2022. https://celikdoo.rs/wp-content/uploads/2022/04/video-f1f37407a9f4a0e740031857091bb02b-V.mp4