In collaboration with the company Karin Komerc MD doo from Veternik, we signed a contract for the dismantling of the existing old railway bridge over the Begej River in Zrenjanin, as well as the installation of a new railway bridge made from the parts of a prefabricated – demountable MD bridge from Novi Sad.
The bridge is located on a single-track railway. Bridge elements with a span of 72.0m were used. The MD bridge elements include longitudinal and transverse beams, vertical steel trusses, braces, and roadway panels.
The existing bridge was a steel truss structure with a triangular infill and a curved upper chord. Jigs were designed for the assembly of the new bridge elements, which were also used for the dismantling of the old one.
At the location of the existing bridge, a new bridge was installed using MD bridge elements. For the purposes of the dismantling and subsequent installation of the steel structure, it was necessary to drive two piles, each consisting of four piles with a diameter of 609×6.3mm.
LOCATION: Zrenjanin
TYPE OF STRUCTURE: Transportation infrastructure – road structure – bridge
STRUCTURE DIMENSIONS: Span of 54m
STRUCTURE WEIGHT: 150 tons
PROJECT DURATION: December 2021 – March 2022
Gallery
Call us
Write to us
Visit us
Follow us
© 2024. Čelik doo. All rights reserved.
| By Lava NET