BBSE Investments Belgrade

INVESTOR: BBSE Investments Belgrade

View All Projects

For the investor specializing in the construction of residential and non-residential buildings, “BBSE Investments,” we added an additional floor to an existing concrete skeletal structure. The supporting structure of the new floor is made of steel.

The steel structure was assembled at a height of 20 meters, using a construction crane. The length and weight of the structure’s elements were determined by the location of the building (transport) and the load capacity of the tower crane.

LOCATION: Belgrade
TYPE OF OBJECT: Mixed-use commercial and residential building
DIMENSIONS: Base 28x42m
WEIGHT OF THE STRUCTURE: 55.5 tons
PROJECT DURATION: December 5, 2018 – March 15, 2019

© 2024. Čelik doo. All rights reserved.