For the project “Construction of a Complex of Manufacturing Facilities for Tire Production with Supporting Infrastructure” in Zrenjanin, 5,000 tons of steel structure were produced.

The PCR passenger tire production facility is part of the LingLong International Europe factory complex and consists of four expansion jointed steel production halls.

Structurally, the halls are multi-bay with cantilevered reinforced concrete columns and a steel roof structure. The transverse spans of the halls are 19m, 24m, and 25m.

For the project, steel supports for pipelines, platforms for silos, supporting secondary structures, and crane track supports were also manufactured.

LOCATION: Zrenjanin
TYPE OF OBJECT: Manufacturing facility
PROJECT DURATION: October 2020 – June 2022