Novi Sad Railway Station
INVESTOR: China Civil Engineering Construction Corporation
As part of the project “Reconstruction and Modernization of the Belgrade-Novi Sad-Subotica-Hungarian Border (Kelebija) Railway,” the Novi Sad-Subotica section includes the reconstruction of the Novi Sad railway station.
A total of 102 steel platform canopies were installed on five platforms at the railway station. The canopy is designed as a steel structure, with a roof covering made of aluminum sheets and tempered glass.
The newly designed canopies come in two types (single-column and double-column). The canopy’s shape is designed to resemble the tessellated roof of the station’s central vestibule, creating a harmonious whole with it.
In addition to the direct infrastructural improvements and contributions to fostering an environment for economic growth and development, such projects promote a sense of community, create better conditions for all users, and make the city a more pleasant place to live.
LOCATION: Novi Sad
TYPE OF STRUCTURE: Steel platform canopy structure
STRUCTURE DIMENSIONS: 816m
STRUCTURE WEIGHT: 1,500t
PROJECT DURATION: December 2021 – July 2023
Gallery
Call us
Write to us
Visit us
Follow us
© 2024. Čelik doo. All rights reserved.
| By Lava NET