Based on the request of our long-time client, the Agricultural Cooperative “Mrkšićevi Salaši,” a new meat processing facility has been constructed in Srpski Itebej. From purely agricultural production on 3,000 hectares of arable land, “Mrkšićevi Salaši” expanded their activities to include meat and meat products, and later ventured into successful bakery production.
Prior to the installation of the hall, earthworks and reinforced concrete works were carried out on the construction site. The assembly of the steel structure, including columns and truss beams, was performed using a 35t mobile crane. After the assembly of the structure, roofing and sheet metal works were completed, and the facility was handed over to the investor for further outfitting.
LOCATION: Srpski Itebej
TYPE OF FACILITY: Meat processing plant
DIMENSIONS OF THE STRUCTURE: 66 x 72 x 11m
WEIGHT OF THE STRUCTURE: 400t
DURATION OF THE PROJECT: July 2019 – December 2020.
Gallery
Call us
Write to us
Visit us
Follow us
© 2024. Čelik doo. All rights reserved.
| By Lava NET