For the client RP Company doo from Novi Sad, we constructed the steel framework for a storage space. The structure was made from HOP profiles and TVL sheets.
In addition to the fabrication and installation of the steel canopy structure, we also performed roofing and sheet metal works. The entrance canopy measures 15x5m and has a height of 4.7m, covering the entrance to the storage area.
The investor requested that the entrance to the building remain completely unobstructed, so the columns, standing at 7.26m, were positioned along the structure.
The columns are anchored to the load-bearing concrete elements of the old warehouse and secured to the concrete slab. Using braces, the roof beams were tensioned and fixed to the steel columns of the canopy.
LOCATION: Novi Sad
TYPE OF STRUCTURE: Production complex
DIMENSIONS OF STRUCTURE: 21 x 20 x 10m; 15 x 5m
WEIGHT OF STRUCTURE: 16.5 tons
DURATION OF PROJECT: August 2019 – October 2019